The Story of the Rome, Watertown, and Ogdensburg Railroad
Реклама. ООО «ЛитРес», ИНН: 7719571260.
Оглавление
Edward Hungerford. The Story of the Rome, Watertown, and Ogdensburg Railroad
The Story of the Rome, Watertown, and Ogdensburg Railroad
Table of Contents
PREFACE
CHAPTER I
CHAPTER II
CHAPTER III
CHAPTER IV
CHAPTER V
CHAPTER VI
CHAPTER VII
CHAPTER VIII
CHAPTER IX
CHAPTER X
CHAPTER XI
CHAPTER XII
APPENDIX A
APPENDIX B
Отрывок из книги
Edward Hungerford
Published by Good Press, 2022
.....
Soon after the organization of the company, T. P. Chandler succeeded Mr. Parish (who was for many years easily the most prominent citizen of Ogdensburgh) as President, and steps were taken toward the immediate construction of the line. After the inevitable preliminary contentions as to the exact route to be followed, James Hayward made the complete surveys of the line as it exists at present, while Colonel Schlatter, its chief engineer and for a number of years its superintendent as well, prepared to build it. Actual construction was begun in March, 1848, in the deep cutting just east of Ogdensburgh. At the same time grading and the laying of rail began at the east end of the road—at Rouse’s Point at the foot of Lake Champlain—with the result that in the fall of 1848 trains were in regular operation between Rouse’s Point and Centreville. A year later the road had been extended to Ellenburgh; in June, 1850, to Chateaugay. On October 1, 1850, trains ran into Malone. A month later it was finished and open for its entire length of 117 miles. Its cost, including its equipment and fixtures, was then placed at $5,022,121.31.
It is not within the province of this little book to set down in detail the somewhat checkered career of the Northern Railroad. It started with large ambitions—even before its incorporation, James G. Hopkins, who afterwards became its Secretary, traveled through the Northern Tier and expatiated upon its future possibilities in a widely circulated little pamphlet. It was a road builded for a large traffic. So sure were its promoters of this forthcoming business that they placed its track upon the side of the right-of-way, rather than in the middle of it, in order that it would not have to be moved when it came time to double-track the road.
.....