Читать книгу Mathematical Programming for Power Systems Operation - Alejandro Garcés Ruiz - Страница 19
1.2.7 Energy storage management
ОглавлениеModern power systems can integrate renewable energy and energy storage devices through a virtual power plant (VPP), an entity that group and centralize the operation of distributed resources to be dispatched by the power system operator. A VPP can encompass an entire region with different renewable sources and energy storage devices. It can also group other microgrids along a distribution feeder.
There are at least two moments where optimization models are required: day-ahead dispatch and real-time operation. Day-ahead dispatch corresponds to the optimization model executed the day before the operation as an economic dispatch model (see Section 1.2.1). This model must include the availability of generation and consider a forecast of the primary resource (inflows, wind, and solar radiance). Moreover, it gives the value power that the VPP operator undertakes on the day of the operation. During the operation, the VPP requires satisfying operative constraints and correcting errors in forecasting the primary resource. Again, a real-time algorithm is necessary for energy storage management.