Читать книгу Harper's New Monthly Magazine, No. XXVI, July 1852, Vol. V - Various - Страница 17
THE ARMORY AT SPRINGFIELD
PROVING
ОглавлениеWhen the barrels are brought pretty nearly to their finished condition, they are to be proved, that is to be subjected to the test of actual trial with gunpowder. For this proving they are taken to a very strong building that is constructed for the purpose, and which stands behind the Stocking Shop. Its place is on the right in the general view of the Armory buildings, and near the foreground – though that view does not extend far enough in that direction to bring it in. The exterior appearance of this building is represented in the above engraving. It is made very strong, being constructed wholly of timber, in order to enable it to resist the force of the explosions within. There are spacious openings in lattice work, in the roof and under the eaves of the building, to allow of the escape of the smoke with which it is filled at each discharge; for it is customary to prove a large number of barrels at a time. The barrels are loaded with a very heavy charge, so as to subject them to much greater strain than they can ever be exposed to in actual service. The building on the left, in the engraving, is used for loading the barrels, and for cleaning and drying them after they are proved. The shed attached to the main building, on the right hand, contains a bank of clay, placed there to receive the bullets, with which the barrels are charged.
The arrangement of the interior of this building, as well as the manner in which the proving is performed, will be very clearly understood by reference to the engraving below.
On the right hand end of the building, and extending quite across it from side to side, is a sort of platform, the upper surface of which is formed of cast-iron, and contains grooves in which the muskets are placed when loaded, side by side. A train of gunpowder is laid along the back side of this platform, so as to form a communication with each barrel. The train passes out through a hole in the side of the building near the door. The bank of clay may be seen sloping down from within its shed into the room on the left. The artist has represented the scene as it appears when all is ready for the discharge. The barrels are placed, the train is laid, and the proof-master is just retiring and closing the door. A moment more and there will be a loud and rattling explosion; then the doors will be opened, and as soon as the smoke has cleared away the workman will enter and ascertain the result. About one in sixty of the barrels are found to burst under the trial.
The pieces that fail are all carefully examined with a view to ascertain whether the giving way was owing to a defect in the welding, or to some flaw, or other bad quality, in the iron. The appearance of the rent made by the bursting will always determine this point. The loss of those that failed on account of bad welding is then charged to the respective operatives by whom the work was done, at a dollar for each one so failing. The name of the maker of each is known by the stamp which he put upon it at the time when it passed through his hands.
The barrels that stand this first test are afterward subjected to a second one in order to make it sure that they sustained no partial and imperceptible injury at the first explosion. This done they are stamped with the mark of approval, and so sent to the proper departments to be mounted and finished.
The bayonets, and all the other parts of which the musket is composed are subjected to tests, different in character indeed, but equally strict and rigid in respect to the qualities which they are intended to prove, with that applied to the barrel. The bayonet is very carefully gauged and measured in every part, in order to make sure that it is of precisely the proper form and dimensions. A weight is hung to the point of it to try its temper, and it is sprung by the strength of the inspector, with the point of it set into the floor, to prove its elasticity. If it is found to be tempered too high it breaks; if too low it bends. In either case it is condemned, and the workman through whose fault the failure has resulted is charged with the loss.