Читать книгу Make Your Garden Feed You - E. Brown T. - Страница 22
SINGLE-SPIT DIGGING
ОглавлениеIn single-spit digging excavate a trench 1 ft. deep (the exact depth should depend upon whether the soil is uniformly good down to this maximum depth) and 1 ft. wide, and remove the soil to the other end of the plot. Six inches away from the edge of the trench insert the spade, lift up a spadeful of mould and throw it into the far side of the trench, breaking up the lumps at the same time. Use the excavated soil for filling the trench which remains when digging is completed