Читать книгу Process Intensification and Integration for Sustainable Design - Группа авторов - Страница 33
2.4.2.1 Changes in Fixed and Variable Costs
ОглавлениеAdditional cases were fed through the base case process design, and any needed modifications were made to meet product specifications. Therefore, fixed and variable costs were first estimated as before, and then only the change in each of these costs was used in the subsequent calculations. For fixed costs, the change was only used in cases where the costs were higher, since the need for smaller equipment does not result in any savings for an existing plant.