Читать книгу Repairable Systems Reliability Analysis - Rajiv Nandan Rai - Страница 12
Оглавление
List of Tables
Table 2.1 | Rotating machine failure data of Example 2.2 |
Table 2.2 | MCF and confidence calculations |
Table 2.3 | Example 2.3—Burn-in period determination |
Table 2.4 | Data for Example 2.4 |
Table 2.5 | List of failure categories and counts for all 53 ROVs |
Table 2.6 | Failure Counts in Months Corresponding their Failure Modes |
Table 2.7 | MCF calculation by combining all failure modes |
Table 2.8 | MCF calculation for individual category at 24 months |
Table 2.9 | A sample of collected data |
Table 2.10 | Exercise 1: Failure data of three systems |
Table 3.1 | Time to failure data (hours) of aero engines of Example 3.2 |
Table 3.2 | Virtual age–based reliability metrics |
Table 3.3 | Time to failure data (hours) of Example 3.4 |
Table 3.4 | Time to failure data (hours) of Example 3.5 |
Table 3.5 | Time between failures for a compressor |
Table 4.1 | Hypothesis tests |
Table 5.1 | Maintenance modeling in repairable systems |
Table 5.2 | Relative outcome of the two overhaul cycles |
Table 5.3 | Relative outcome of the two overhaul cycles |
Table 5.4 | Comparative results of both overhaul cycles (Variant 1) |
Table 5.5 | Comparative results of both overhaul cycles (Variant 2) |
Table 5.6 | Results-failure mode wise for first overhaul cycle |
Table 5.7 | Results-failure mode wise for t2OH |
Table 5.8 | Failure mode wise percent improvement |
Table 5.9 | Comparative results of both overhaul cycles for the aero engine |
Table 6.1 | Extensions to standard FMEA |
Table 6.2 | Failure cause-mode effect relationship |
Table 6.3 | Severity rating |
Table 6.4 | Occurrence rating |
Table 6.5 | Failure mode wise initial RPN |
Table 6.6 | Failure mode wise values of final Q |
Table 6.7 | Final RPNs |
Table 6.8 | FM1 |
Table 6.9 | FM2 |
Table 6.10 | FM3 |
Table 6.11 | Comparative results |
Table 7.1 | Brief literature review on WSCE using MCDM |
Table 7.2 | Weights for API |
Table 7.3 | Actual and scaled API values of each weapon category |
Table 7.4 | APV estimation of combat force “ALPHA” |
Table 7.5 | APV enhancement |
Table 7.6 | APIij values |
Table 7.7 | Cij (million USD), ai, di, and mi |
Table 7.8 | Aij values |
Table 7.9 | Optimal xij values |
Table 8.1 | Brief literature review on TH analysis |
Table 8.2 | Required TH of the three components |
Table 8.3 | Process requirements of LPCR blades repair |
Table 8.4 | Process requirements of CCOC repair |
Table 8.5 | Process requirements of LPTR blades repair |
Table 8.6 | Component 1—LPCR blades |
Table 8.7 | Component 2—CCOC |
Table 8.8 | Component 3—LPTR blades |