Читать книгу Practical Risk Management for EPC / Design-Build Projects - Walter A. Salmon - Страница 30

Notes

Оглавление

1 Government of South Australia (2005). Construction Procurement Policy Project Implementation Process. ISBN 0-9775044-0-7. www.dpti.sa.gov.au/__data/assets/pdf_file 0020/51653/pip.pdf (accessed 28 November 2017).

2 Bobbitt Design Build Inc. (15 April 2019). New study: design-build can cut project delivery time in half. https://www.bobbitt.com/article/new-study-design-build-can-cut-project-delivery-time-in-half (accessed 6 May 2019).

3 Wikipedia. Design-build. https://en.wikipedia.org/wiki/Design-build (accessed 23 August 2018).

4 Douglas R. (2016). EPC or EPCM contracts, which one can drive stronger outcomes for project owners? http://www.ausenco.com/en/epc-epcm-whitepaper (accessed 11 November 2017).

5 Both books published by FIDIC (also known as ‘The International Federation of Consulting Engineers’, FIDIC being the acronym of the French version of its name).

6 Loots P. and Henchie N. (2007). Worlds Apart: EPC and EPCM Contracts: Risk Issues and Allocation, Mayer Brown, p. 2.

7 McNair D . (January 2016). EPCM Contracts: project delivery through engineering, procurement and construction management contracts. www.pwc.com.au/legal/assets/investing-in-infrastructure/iif-8-epcm-contracts-feb16-3.pdf (accessed 29 October 2018).

8 Ibid., Section 2.4.2.

9 Agarwal R., Chandrasekaran S. and Sridhar M. for McKinsey & Company (June 2016). Imagining construction's digital future. http://www.mckinsey.com/industries/capital-Projects-and-infrastructure/our-insights/imagining-constructions-digital-future, p. 1, Exhibit 1 (accessed 23 August 2017).

10 10 My conclusion does not apply to ‘reimbursable’ type EPC Contracts (which nearly always benefit the Contractor, but, sadly for Contractors, seem to be next to non-existent nowadays).

11 11 Johannsen H ., for Singleton Urquhart LLP (21 November 2017). Design-build /EPC contracts. www.inf.gov.nt.ca/sites/inf/files/resources/design-build_epc_contracts_-_pmc_2017_helmut.pdf (accessed 5 May 2018).

12 12 Galonske B. and Weidner W. (2010). Profitability of plant construction – risk management as a profit driver. http://www.oliverwyman.com/content/dam/oliver-wyman/global/en/files/archive/2011/Risk_management_as_a_profit_driver_Perspectives_2_2010_en.pdf, p. 14 (accessed 22 October 2017).

13 13 Saipem (2014–2015). General EPC contractors in oil & gas markets. http://www.diem.ing.unibo.it/personale/saccani/index_files/Impianti%20Meccanici%20T%20(dal%202014-2015)/Il%20processo%20EPC.pdf, p. 4 (accessed 1 June 2018).

Practical Risk Management for EPC / Design-Build Projects

Подняться наверх