3.1.1 Submittals
ОглавлениеContractors and system integrators typically prepare detailed drawings of instrumentation systems before installing them. These drawings include loop diagrams, panel drawings, manufacturers’ data, PLC programs, DCS configuration, interconnecting wiring diagrams, and so on. The design team should thoroughly review these documents to ensure that they comply with the design’s requirements. The following is a list of submittals typically expected from the contractor or system integrator for the automation portion of a WRRF:
• System integrator technical proposal;
• Automation system project schedule;
• Control system architecture;
• Instrument data sheets;
• Detailed panel drawings, including layout, wiring schematics, and so on;
• Automation equipment hardware;
• Instrument installation details;
• Software
Human–machine interface,
Programmable logic controller program listing,
Distributed control system configuration,
Simulation programs for factory acceptance test,
Historian configuration,
Alarm management,
Intelligent asset management and computerized system, and
Maintenance management systems; and
• Alarm notification systems.