Читать книгу Automation of Water Resource Recovery Facilities - Water Environment Federation - Страница 100

3.1.1 Submittals

Оглавление

Contractors and system integrators typically prepare detailed drawings of instrumentation systems before installing them. These drawings include loop diagrams, panel drawings, manufacturers’ data, PLC programs, DCS configuration, interconnecting wiring diagrams, and so on. The design team should thoroughly review these documents to ensure that they comply with the design’s requirements. The following is a list of submittals typically expected from the contractor or system integrator for the automation portion of a WRRF:

• System integrator technical proposal;

• Automation system project schedule;

• Control system architecture;

• Instrument data sheets;

• Detailed panel drawings, including layout, wiring schematics, and so on;

• Automation equipment hardware;

• Instrument installation details;

• Software

Human–machine interface,

Programmable logic controller program listing,

Distributed control system configuration,

Simulation programs for factory acceptance test,

Historian configuration,

Alarm management,

Intelligent asset management and computerized system, and

Maintenance management systems; and

• Alarm notification systems.

Automation of Water Resource Recovery Facilities

Подняться наверх