Читать книгу POOL NAVIGATOR - Werner Senften - Страница 2

Оглавление

Inhaltsverzeichnis

Titel

Pool Navigator

My pool story

Regulations/building application

Assembling the pool

The floor tile was followed by the construction - pool liner is inserted and the pool is filled with water.

The sand filter system

Normal summer operation - 4-way valve

What is a skimmer and how does it work?

Floor cleaning

Using pool chemicals correctly

Iso-Solar-Swimming Pool Cover

Wintering

Summary of the planning of a swimming pool

5. the backfill material can freeze out over the winter months.

Checkliste

Imprint

Disclaimer

Assembly/Tips! (Start of construction in autumn)

1. the garden season is over and the garden is no longer used as a living space.

2. the construction of a built-in pool is connected with structural measures. Earth-moving work and a construction site are therefore unavoidable.

3) For the installation of a swimming pool, taking into account the garden design, a period of 4-6 weeks is to be estimated. If the customer builds his pool in spring, this inevitably means that a good part of the swimming season is lost.

4. the children do not push for the completion in autumn.

Impressum neobooks

POOL NAVIGATOR

Подняться наверх