Читать книгу POOL NAVIGATOR - Werner Senften - Страница 2
ОглавлениеInhaltsverzeichnis
Regulations/building application
Normal summer operation - 4-way valve
What is a skimmer and how does it work?
Using pool chemicals correctly
Summary of the planning of a swimming pool
5. the backfill material can freeze out over the winter months.
Assembly/Tips! (Start of construction in autumn)
1. the garden season is over and the garden is no longer used as a living space.
2. the construction of a built-in pool is connected with structural measures. Earth-moving work and a construction site are therefore unavoidable.
3) For the installation of a swimming pool, taking into account the garden design, a period of 4-6 weeks is to be estimated. If the customer builds his pool in spring, this inevitably means that a good part of the swimming season is lost.
4. the children do not push for the completion in autumn.