2.4 Connection to Power Utility

Оглавление

The investors will likely not be interested in building this industrial facility unless they have spoken to the utility and were assured that there is available generating capacity to power the project.

Let us talk to the Utility to acquire the information we need to build our plant power distribution system. Here are some of the issues to be clarified by the Utility engineers:

 Power agreement: firm or interruptible

 Tariffs, for power demand and time of use

 Line voltage and its daily and weekly profile

 Frequency off‐limits

 Power factor tariffs and penalties

 Source impedance, inclusive of the transmission line impedance (conductors)

 Double‐ or single‐circuit incoming transmission line

 Generating capacity, firm power, how many units are available, and their ratings

 Method of line protection

 Lightning level (number of lightning days/yr) in the area

Let us review each of the aforementioned issues:

 Power agreement: The plant owner will sign a power agreement with the Utility. If the plant needs power 24 hours a day, every day, the owner will look at signing a power agreement for uninterruptible firm power supply, if available. An interruptible power supply allows the utility to occasionally cut the power supply in a specific amount or in total. Naturally, this contract comes with a lower tariff. The plant owner will likely insist on an uninterruptible power supply (UPS).

 Tariffs: In addition to the nominal charge for kilowatt‐hour consumed, the utility will likely have additional tariffs as demand charge, peak load, and reactive power hour consumption (MVARh consumption). The demand is the load averaged over a specified time (15 minutes, 30 minutes, or 1 hour) in kW or KVAR. The peak load may be the maximum instantaneous load or a maximum average load over a designated period of time. The reactive energy charge may be applicable for the load operating at <95% power factor at the point of interconnection (POI).

 Voltage operating range: For this plant, 69, 138, and 230 kV voltages can be used. In this case, 230 kV is available and preferred. We have to determine the percentage range of voltage oscillations received from the utility and how stable it is. The next thing is to decide if our plant will need an automatic on‐load tap changers (OnLTCs) on the main incoming power transformers, or simple off‐load tap changers (OffLTCs). See a typical transformer in Figure 2.4.


Figure 2.4 Large oil filled transformer.

Assume a 20% adder to the cost of a transformer with an automatic tap changer. On the other hand, an automatic LTC can, in addition to keeping the plant voltage constant, better regulate the flow of power and save us some money in penalties charged by the utility for the low plant power factor.

If the voltage swings are large, OffLTC changers may not be able to provide a manageable operating solution. They can regulate the plant voltage manually to a preselected percentage tap, while the OnLTCs manage the plant voltage automatically and linearly to the full tap range of ±10% on the primary winding.

If OffLTCs are employed, the operator will have to shut down the plant in order to change the taps, if desired. Naturally, manual tap changes cannot be performed on a regular daily basis. Voltage at night may be higher than during the day. So once you set the taps, that is it. You may be forced to change the tap settings again if the operating conditions alter.

Suppose, you have decided that your incoming transformers are to be rated 230 to 13.8 kV. Also, you were informed that the incoming voltage from the utility varies from 215 to 245 kV, but most likely toward the lower range (see Chapter 24 for more details on transformers).

Let us examine in Table 2.1 the voltage range at the secondary side of the transformers with OffLTCs for the various taps and voltage swings:

 Transformer voltage: 230 to 13.8 kV

 Taps on primary side range: ±10% in 2.5% steps.

Based on the aforementioned, a choice would be to operate the transformer with OffLTC at −2.5% taps for the primary voltage range of 215–245 kV. Negative taps on the transformer primary winding are the taps of choice used for boosting the plant 13.8 kV voltage. On the other hand, the OnLTC, if used, will maintain voltage relatively steady in smaller tap movements within the full tap range.

Table 2.1 Secondary voltage for primary grid voltage.

Grid voltage 215 kV 230 kV 245 kV
Taps set at:
−5.0% 13.54 14.48 15.42
−2.5% 12.98 14.14 15.05
0 12.89 13.8 14.69
+2.5% 12.57 13.45 14.32
+5.0% 12.25 13.10 13.95

Most of the industrial plants would purchase transformers with OffLTCs. In this case, based on the discussions with the utility and due to the expected significant variations in the day/night voltage profile, we would prefer transformers with automatic OnLTCs to make sure we have a stable voltage in the plant at all times.

The plant voltage profile is not determined solely by the utility but also by the plant motor load. Plant reactive MVAR load will likely have to be partly drawn from the utility, as explained in Chapter 13.

The smaller plant transformers, which distribute power to lower voltages, will generally have (±5%) OffLTC tap changers. Taps for each transformer will have to be set to obtain the most comfortable voltage profile throughout the plant during the normal plant operation and for large motor starting. This can be determined by a computer load flow study and confirmed during the plant operation. With the choice of OnLTC on our main transformers, we can consider that our plant distribution voltage will be relatively constant at 13.8 kV at all times, irrespective on what the utility throws at us.

The typical voltage drop criteria to be considered in the design of the plant distribution system is <15% for large motor starting, and <3% for large motor while running.