Читать книгу Practical Power Plant Engineering - Zark Bedalov - Страница 50

2.4.5 Utility Generating Capacity

Оглавление

This information we require to be able to determine if our plant will need some supplementary firm generation at site and also if we would be able to expand the plant in the future in case our ore body miraculously doubles up. We will look into a possibility of having a solar plant or a wind farm to augment our power sources. The solar and wind resources cannot be counted in as firm capacity, but simply as a source of power to displace the fuel consumption or import of power (see Chapters 25 and 26).

Practical Power Plant Engineering

Подняться наверх