Читать книгу Construction Management JumpStart - Barbara J. Jackson - Страница 151
Managing Project Quality
ОглавлениеThe quality standards on any project are established in the plans and specs prepared by the designer. Within these documents, specific measurable conditions are given. These include dimensions, tolerances, test results, temperatures, and so on. It is the contractor's responsibility to see that all such quality standards are met and verified. For the builder to accomplish this goal, they must organize, institute, and adhere to a quality control plan. The quality control plan usually consists of a number of inspections, field tests, lab tests, and observations. It is very important that the contractor be able to document and report satisfactory compliance because only after the standards have been met will the owner accept the work and release payment.