Читать книгу Pittsburgh Main Thoroughfares and the Down Town District - Frederick Law Olmsted - Страница 12
Second Avenue Freight Yards
ОглавлениеMention should here be made of a plan, which it is understood is already being considered, to develop the area between Second Avenue and the river, from Try Street to the Tenth Street bridge, for freight purposes. Even now the connections from this region to the Tenth Street and Smithfield Street bridges, and, via First and Second Avenues, to the whole Point District, are good. But the street changes proposed in connection with the traffic center at Sixth Avenue and Forbes Street will provide greatly improved connections directly to the Point District, the East End and the South Hills. First Avenue and Water Street would enter the freight yard underneath the Panhandle and the proposed Baltimore and Ohio local tracks; and if Second Avenue is raised to go over the Panhandle tracks, as recommended above, direct entrances can be secured to the second or third floor of a freight house with car elevators such as those at St. Louis. On the whole this seems like a good place for a large distributing freight station.