Читать книгу Pittsburgh Main Thoroughfares and the Down Town District - Frederick Law Olmsted - Страница 14

Grant Boulevard Extension

Оглавление

Table of Contents


Diagram showing the distribution of automobiles coming in town on Grant Boulevard

Only one other thoroughfare problem is involved with the "Hump Cut," that of Grant Boulevard extension. Since the grade of Webster Avenue will be considerably lowered in connection with the "Hump Cut," and the buildings along its lower end greatly damaged in any case, by far the best plan for Grant Boulevard is to carry it straight through to Webster Avenue and to widen the lower end of the latter to 60 feet, as far as Grant Street. The widening of Oliver Avenue to 50 feet between Grant and Smithfield Streets, and the possible widening of Strawberry Way, would, together with existing streets, provide adequate means of distribution for the large number of automobiles using the boulevard, and would at the same time create a decided local improvement.

Pittsburgh Main Thoroughfares and the Down Town District

Подняться наверх