PROJECT MANAGEMENT
KANBAN Project Management Methods
ОглавлениеKANBAN is also a flexible, iterative-incremental approach to project management based on Agile ideas. It is the opposite of the “SCRUM” method. The main features of the technique are:
• Each project participant assumes a limited number of assignments independently, without the manager’s direction;
• The assignment is registered in Sticker;
• The number of “unfinished” work (WIPs) is limited for each stage;
• A new assignment is taken only upon completion or “extension” of the current one (LEAN);
• More attention paid to management of change, visualization of gaps, incomplete work, etc.
• Limitations on WIPs number and their status.
LEAN looks a bit abstract, but being combined with KANBAN, it is much easier to use to build your own project management system. KANBAN is very similar to the industrial production flowchart. A piece of metal entering the process in the very beginning becomes the finished part at the very end. The increment of the product in KANBAN is transferred from stage to stage, resulting in the ready item for delivery. The main principle is to keep in store only stuff required by the customer. Therefore, KANBAN allows leaving an incomplete assignment at one of the stages, if its priority has changed and there are other urgent tasks to do – all this is OK for KANBAN.
KANBAN is much less strict than SCRUM since it does not restrict the time of sprints, or has any roles, except for the product owner. KANBAN even allows a team member to carry out several assignments simultaneously, while SCRUM does not. In addition, meetings on the project status are not regulated – one can do it in a convenient schedule, not to do it at all.
Working with KANBAN requires identification of workflow stages, which are presented as columns where assignments are indicated by stickers. The stickers are transferred from stage to stage, as parts are transferred from machine to machine within the factory. The completion level on each stage increases. The output is a product element ready for supply to the customer. A board with columns and stickers can be physical or electronic since KANBAN does not restrict its users. KANBAN system can be as flexible as you want it to be as KANBAN is a visualization of AGILE idea of in many ways.
KANBAN has four pillars to support the whole system:
• Stickers: Each assignment has an individual sticker, containing all required information on the assignment. Therefore, all required information is available at all time.
• Limited number of assignment per stage: The number of stickers per stage is strictly regulated. Thanks to this, a “jam” in the workflow is clearly visible and promptly eliminated.
• Continuous flow: Tasks from the backlog get into the flow in order of priority. Thus, the work never stops.
• Continuous Improvement (kaizen): The concept of continuous improvement was first implemented in Japan at the end of the 20th century. Its essence is the constant analysis of the production process and the search for ways to increase productivity.
Strengths – Like SCRUM, KANBAN is well suited for a well-knitted team with good communication. But unlike SCRUM, KANBAN does not have a clear timeframe, which is more appropriate for motivated and experienced teams. If adjustment and management are proper, KANBAN can be of great benefit to the project team. Exact calculation of the load on the team, the correct placement of restrictions and concentration on continuous improvement – all this allows KANBAN to save resources, stay within the schedule, and budget. And all above-mentioned is spiced up with flexibility.
Weaknesses – one can often hear that KANBAN, unlike SCRUM, suits nearly any team. But this is a false statement. KANBAN is best suited for teams whose members have overlapping skills. So, they can help each other overcome difficulties in solving problems. Otherwise, Kanban will not be as effective as it could be. As mentioned before, KANBAN is better suited in cases with no strict deadlines. The project with strict deadlines is better managed by classical approach or SCRUM.