Читать книгу Practical Risk Management for EPC / Design-Build Projects - Walter A. Salmon - Страница 13

Notes

Оглавление

1 International Construction Measurement Standards Coalition (2017). International Construction Measurement Standards – Global Consistency in Presenting Construction Costs, 1e. International Construction Measurement Standards Coalition, p. 7.

2 Construction Executive (16 April 2014). Understanding D&O liability insurance coverage. www.constructionexec.com/article/understanding-do-liability-insurance-coverage (accessed 21 March 2018).

3 Strategic Risk (15 October 2018). Carillion collapse: the lessons learnt in supply chain risk. Newsquest Specialist Media Limited. www.strategic-risk-europe.com/carillion-collapse-the-lessons-learnt-in-supply-chain-risk/1428293.article (accessed 16 October 2018).

4 I consider that a good starting point would be the APM (Association for Project Management) publication ‘Project Risk Analysis and Management Guide’ (PRAM Guide).

5 Fédération Internationale des Ingénieurs-Conseils (FIDIC) (2017). Conditions of Contract for EPC Turnkey Projects, 2e. Fédération Internationale des Ingénieurs-Conseils/International Federation of Consulting Engineers.

6 Banaszak J., Palter R. and Parsons M. (March 2017). Stopping the insanity: Three ways to improve contractor-owner relationships on capital Projects. www.mckinsey.com/industries/capital-Projects-and-infrastructure/our-insights (accessed January 2018).

7 Banik G.C. and Hannan F. (2008). Specialty Contractors' Perspectives on Risk Importance and Allocation of Design-Build Contracts – Abstract (School of Architecture, CET and Construction Southern Polytechnic State University).

8 Association for Project Management. APM PRAM Guide. Association for Project Management, p. 98: ‘Risks are more likely to be acted on if responsibility is allocated to individuals’.

9 FIDIC – Fédération Internationale des Ingénieurs-Conseils.

10 10 Ibid.

11 11 Published by ICE Publishing (part of the Institution of Civil Engineers).

12 12 Published by the Institution of Chemical Engineers.

13 13 Such as, but by no means limited to, Hudson's Building and Engineering Contracts (by Hudson A.A. and Wallace I.N.D.) and also Construction Contracts - Law and Management (by Hughes W., Champion R. and Murdoch J.).

14 14 Billows J., Kroll K., Pikul P . et al. (August 2018). Capital Project value improvement in the 21st century: Trillions of dollars in the offing. www.mckinsey.com/industries/capital-Projects-and-infrastructure/our-insights/capital-Project-value-improvement-in-the-21st-century-trillions-of-dollars-in-the-offing (accessed 05 September 2018).

15 15 MBA Knowledge Base (5 March 2012). Build Operate Transfer (BOT) Model. www.mbaknol.com/Project-management/build-operate-transfer-bot-model (accessed 31 July 2018).

16 16 Hyari K. and Kandil A (2009). Validity of Feasibility Studies for Infrastructure Construction Projects. Jordan Journal of Civil Engineering, 3(1).

Practical Risk Management for EPC / Design-Build Projects

Подняться наверх