Читать книгу Practical Risk Management for EPC / Design-Build Projects - Walter A. Salmon - Страница 17

2.2.3 Contractor's Role and Responsibilities

Оглавление

The Contractor's role and responsibilities under the Traditional Contracting approach are as follows.

1 Preparing and submitting a commercial bid for the Project, based on the drawings and specifications prepared by the Design Team. That will most likely be against bills of quantities provided by the Employer's Team, which the Contractor can assume accurately reflect what is needed to be provided in respect of the physical work for the completed facility.

2 After award of the construction contract for the Project:ordering the required materials, goods, and equipment in line with the specification requirements,providing and supervising all labour and construction equipment necessary for constructing, testing, and commissioning the completed facility, andhanding the completed facility over to the Employer for occupation/use.

3 Rectifying, at no cost to the Employer, any defects found in the completed facility during the warranty period following handover (often referred to as the ‘defects liability period’).

Practical Risk Management for EPC / Design-Build Projects

Подняться наверх