Читать книгу Practical Power Plant Engineering - Zark Bedalov - Страница 30
1.3.4 Power Plant Grid Tests
ОглавлениеThe power plant or a unit connected to a HV grid is often subjected to a number of grid tests that must be completed to confirm its compatibility with the grid and to operate from the dispatch center. Here is a list of some of the grid tests:
Load dispatch following capability
Reactive power dispatch follow
Isochronous capability (droop)
Dispatch MW ramp rate
Fast ramp MW response
Synchronous condenser mode switchovers
Primary/secondary high‐frequency response
Under‐frequency trip setting check (simulation)
Loss of station service AC supply – switchover to standby power
Black start, synchronizing on islanded grid dead bus
House load operation on generator power for two hours