Читать книгу Automation of Water Resource Recovery Facilities - Water Environment Federation - Страница 55
1.0 THE DESIGN PROCESS
ОглавлениеA typical control system design project for a water resource recovery facility (WRRF) has three phases: predesign, detailed design outline, and final design (Figure 3.1). The guidelines presented, although geared to a medium-sized WRRF, are, with minimal adjustments, applicable to projects of all sizes. Where some requirements may be more applicable to medium-sized or larger facilities, the design concepts can easily be tailored to suit smaller facility designs. This chapter describes automation design for WRRFs and provides systematic methods for implementing the design to achieve intended design goals.
FIGURE 3.1 Typical automation project execution.