Читать книгу Automation of Water Resource Recovery Facilities - Water Environment Federation - Страница 61
2.1 Bid Documents 2.1.1 Specifications
ОглавлениеBid documents include the specifications listed in Table 3.1. At a minimum, these documents are required for a traditional design package with implementation of the design by a contractor or system integrator or a combination of both.
TABLE 3.1 Various design documents and industry standards.